Material Master
Bill of Material – BOM
Work Center
Routing – Different types of Routing
Production Version
Standard Planning (with standard so76 info structure)
Planning with the Product Groups
Planning with the Materials
Product Group Aggregation and Desegregation
Creation of Plan and version management
Transfer of Plan to Demand Management
Demand Planning
Creation of PIR (Planned independent requirements)
Planning Strategies
Master Data requirements in MRP
Carrying MRP Procedure MRP, MPS, CBP
Difference between MRP Vs MPS
Control indicators Processing like NETCH, NETPL, NEUPL
Evaluation of planning results and planning table
Master Production Scheduling planning run (MPS RUN)
Processing Planned orders
Planned orders conversion
Production Orders from planned orders
Production order creation
Production order confirmation
Goods Receipt wref to Production Order
Goods Issue wref to Production Order
Creation of GI wref to Reservation
Restricting Goods Receipt Unless Production Order is Confirmed
Condition Tables
Access Sequence
Strategy Types
PP Batch Search Procedure
Batch Status in PP
Characteristics and class
SLED In Batch in PP
Manual And Automatic Batch Display In PP
Production orders creation using Batch
Characteristics
Class
Classification
Classification settings in material master
Maintain Dependency
Configurable Profile for Material
Master Data Maintenance
Production versions
REM Profile
Backflusing
REM Backflusing
.
Read More Read Less